On the seismic stability analysis of reinforced rock slope and optimization of prestressed cables
Wenbo ZHENG, Xiaoying ZHUANG, Yongchang CAI
Frontiers of Structural and Civil Engineering 2012, Volume 6, Issue 2, Pages 132-146 doi: 10.1007/s11709-012-0152-z
Keywords: high rock slope reinforced system optimization prestressed cable seismicity
Bioengineering protection mechanism of city rock slope and its laboratory test
Desong JIANG, Minghua ZHAO, Chong JIANG,
Frontiers of Structural and Civil Engineering 2009, Volume 3, Issue 4, Pages 414-421 doi: 10.1007/s11709-009-0055-9
Keywords: indoor engineering project protection mechanism different runoff lagging
Zhiming ZHAO, Xihua WANG
Frontiers of Structural and Civil Engineering 2013, Volume 7, Issue 3, Pages 332-340 doi: 10.1007/s11709-013-0206-x
Keywords: slope stability strength properties model test numerical analysis
Hehua ZHU, Qianwei XU, Wenqi DING, Feng HUANG
Frontiers of Structural and Civil Engineering 2011, Volume 5, Issue 2, Pages 208-224 doi: 10.1007/s11709-011-0111-0
Keywords: progressive failure weak-broken rock slope model test bolt
Li Jianming
Strategic Study of CAE 2004, Volume 6, Issue 5, Pages 79-82
Through researching on a rock slope by the improved CSF methods,the paper works out not only the securitycoefficient of the slope but also its critical slip surface, the influence factors and slip causes.
Keywords: CSF computing methods rock slope stability
Jiu-jiang WU,Qian-gong CHENG,Xin LIANG,Jian-Lei CAO
Frontiers of Structural and Civil Engineering 2014, Volume 8, Issue 3, Pages 252-259 doi: 10.1007/s11709-014-0260-z
Keywords: high loess slope CSNSP PLAXIS phi/c strength reduction method Sweden circular slip surface
Frontiers of Structural and Civil Engineering Pages 1370-1386 doi: 10.1007/s11709-023-0947-0
Keywords: tunnel boring machine hard-rock cutting free face disc cutter rock-cutting efficiency
Dai Huichao
Strategic Study of CAE 2003, Volume 5, Issue 7, Pages 11-16
The deep water high earth-rock cofferdam in the 2nd phase construction of TGP is a hard and challenge
Keywords: TGP deep water high earth-rock cofferdam design constraction
Practice and Experimental Verification of TGP’s Permanent Shiplock Slope
Zhang Chaoran
Strategic Study of CAE 2001, Volume 3, Issue 5, Pages 22-27
The high slope for the permanent shiplock of the Three Gorges Project (TGP), excavated from the mountainThe excavation for the slope on each side is 170 m deep in maximum consisting of a 68m high verticalSeveral aspects are described in the paper for the permanent shiplock slope including the general description
Keywords: TGP permanent shiplock high slope
Stability and deformation analysis of high slope for tank type of bunker at Donglutian coal mine
Jiang Haibo,Gong Shoucai,Liu Qingxue
Strategic Study of CAE 2012, Volume 14, Issue 2, Pages 107-112
Keywords: tank type of bunker slope limit equilibrium method finite element method (FEM) stability deformation
Monitoring Technology to Stability of Layered Rocky High Side Slope
Chen Zhijian
Strategic Study of CAE 2001, Volume 3, Issue 5, Pages 86-91
Based on the example of monitoring to the stability of the layered rocky high slope, base and foundationrational arrangement of monitoring spots, the embedding technology of hole with clinometer in fragmentary rockmass in high slope and the establishment of the monitoring and predictive model to the stability ofhigh slope are elucidated.The discriminating discipline for the high slope stability based on the monitoring deformation result
Keywords: Jiangyin Bridge tower side slope stability monitoring hole with clinometer monitoring and predictive
Chen Zhijian,Zhou Shizhong ,Zhuo Jiashou
Strategic Study of CAE 2002, Volume 4, Issue 6, Pages 20-24
Keywords: layered rock mass slope monitoring and forecast model technical methods
Theory and application of construction simulation for roller compaction of high core rock-fill dam
Zhong Denghua,Zhao Chensheng,Zhang Ping
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 28-32
Based on the overall analysis of roller compaction system of high corerock-fill dam, the theory of construction simulation for roller compaction is put forward and the simulationmodel is set up which can actually reflect the uncertainties of the rock-fill dam roller compactionThis study achievement has been applied to the filling unit construction process of the Nuozhadu highcore rock-fill dam to verify the reliability of the simulation model, which gives important guidance
Keywords: high core rock-fill dam roller compaction construction simulation
Efficiency of scalar and vector intensity measures for seismic slope displacements
Gang WANG
Frontiers of Structural and Civil Engineering 2012, Volume 6, Issue 1, Pages 44-52 doi: 10.1007/s11709-012-0138-x
Keywords: seismic slope displacements intensity measures empirical prediction
Evaluation and prediction of slope stability using machine learning approaches
Frontiers of Structural and Civil Engineering 2021, Volume 15, Issue 4, Pages 821-833 doi: 10.1007/s11709-021-0742-8
Keywords: slope stability factor of safety regression machine learning repeated cross-validation
Title Author Date Type Operation
On the seismic stability analysis of reinforced rock slope and optimization of prestressed cables
Wenbo ZHENG, Xiaoying ZHUANG, Yongchang CAI
Journal Article
Bioengineering protection mechanism of city rock slope and its laboratory test
Desong JIANG, Minghua ZHAO, Chong JIANG,
Journal Article
Evaluation of potential failure of rock slope at the left abutment of Jinsha River Bridge by model test
Zhiming ZHAO, Xihua WANG
Journal Article
Experimental study on the progressive failure and its anchoring effect of weak-broken rock vertical slope
Hehua ZHU, Qianwei XU, Wenqi DING, Feng HUANG
Journal Article
Research on the Stability of a Slope in One Hydropower Station by the Improved Critical Slip Field (CSF
Li Jianming
Journal Article
Stability analysis of a high loess slope reinforced by the combination system of soil nails and stabilization
Jiu-jiang WU,Qian-gong CHENG,Xin LIANG,Jian-Lei CAO
Journal Article
Field and laboratory experimental studies on hard-rock tunnel excavation based on disc cutter coupledwith high-pressure waterjet
Journal Article
Science and Technology Innovation of the Deep Water High Earth-rock Cofferdam in the Three Gorges Project
Dai Huichao
Journal Article
Practice and Experimental Verification of TGP’s Permanent Shiplock Slope
Zhang Chaoran
Journal Article
Stability and deformation analysis of high slope for tank type of bunker at Donglutian coal mine
Jiang Haibo,Gong Shoucai,Liu Qingxue
Journal Article
Technical Methods to Make Safety Monitoring and Forecast Models for the Foundation of Long Suspension Bridges
Chen Zhijian,Zhou Shizhong ,Zhuo Jiashou
Journal Article
Theory and application of construction simulation for roller compaction of high core rock-fill dam
Zhong Denghua,Zhao Chensheng,Zhang Ping
Journal Article
Efficiency of scalar and vector intensity measures for seismic slope displacements
Gang WANG
Journal Article